davidfacer.com / aimaturitymodels.com / AI-Native Maturity Models / AI-Native SDLC / D10
Release discipline
Release cadence used to be a scheduling question — every two weeks, every quarter. This dimension treats it as a governance question instead: how does validated work actually get gated, approved, and rolled back, and does that process compress on demand or stay locked to a calendar regardless of how ready the work actually is?
Where most organizations start (Nascent)
Releases follow a fixed cadence with manual gating, approval, and announcement — meaning validated work sometimes waits weeks for a scheduled release window that has nothing to do with its own readiness. The first real step is decoupling release opportunities from that fixed cadence: letting validated changes release more often, with the minimum test gates automated, while approval and communication stay manual until confidence builds.
Where the real gains happen (Modeled → Integral)
The meaningful shift is triggering deployment from commits passing automated gates rather than from the calendar — with automated rollback based on deterministic health checks. The bigger gain beyond that is automating pre-deployment approval, compliance checks, and audit evidence under governed policy, and normalizing rollback as a practiced, expected recovery path rather than something reserved for emergencies.
What the top of the curve actually looks like (Telemetric)
At full maturity, pre-deployment gates are treated as necessarily incomplete for AI-generated, non-deterministic output — release decisions extend into production itself, using live signals (error budgets, behavior anomalies, evidence coverage) as part of the release decision, not just post-release monitoring. A release can be incrementally expanded, held, or reversed based on how it's actually behaving, not only on what pre-deployment checks predicted.
Why this dimension matters
The organizations that treat rollback as a rare emergency response tend to under-invest in it — which is exactly backwards once release frequency increases. This dimension measures whether recovery is a practiced, cheap, everyday capability or a break-glass procedure nobody has actually rehearsed.
Drafted from the SDLC model's real locked content — including the transition and verification notes now folded into ai_native_sdlc_maturity_model.md itself (2026-07-27). D10 carries no open review flag.
Drafted from the SDLC model’s real locked content.